top of page
500 MW Solar Farm +
250 MW / 1000 MWh BESS
Facility in NM, USA
A 500 MW utility-scale solar farm in New Mexico, delivered with a US developer: 2,000 acres, 900,000+ bifacial modules on single-axis trackers, 95 central inverters and a 345 kV substation — about 100,000 homes' worth of power. A 250 MW / 1,000 MWh battery system alongside it handles peak-shaving and energy shifting.
Sunforest’s scope included development engineering, plant layout, planning,
system design, terrain analysis, energy simulation, and creating civil & electrical plan sets.

bottom of page
